Find the most up-to-date version of IEC at Engineering Buy IEC LAMP CAPS AND HOLDERS TOGETHER WITH GAUGES FOR THE CONTROL OF INTERCHANGEABILITY AND SAFETY – PART 3. Buy IEC Amd Ed. Amendment 22 – Lamp caps and holders together with gauges for the control of interchangeability and safety. Part 3: Gauges.

Author: Yokus Golkis
Country: Kazakhstan
Language: English (Spanish)
Genre: Spiritual
Published (Last): 14 December 2009
Pages: 482
PDF File Size: 3.72 Mb
ePub File Size: 18.83 Mb
ISBN: 562-1-25294-915-7
Downloads: 97368
Price: Free* [*Free Regsitration Required]
Uploader: Douzahn

We have no document history for this standard.

IEC /AMD | IEC Webstore

Please first verify your email before subscribing to alerts. Inquiry Sent Successfully Confirmation email has been sent: Standards Subscriptions from ANSI provides a money-saving, multi-user solution for accessing standards.

Please reply me within 24 hours. Your message must be betweencharacters! Your email address is incorrect! Subscription pricing is determined by: If the document is revised or amended, you will be notified by email. Shenzhen Chuangyin Technology Co. You can download and open this file to your own computer but DRM prevents opening this file on another computer, including a networked server.

Proceed to Checkout Continue Shopping. Site Member 3 Years.

  LOS AMORES RIDICULOS MILAN KUNDERA PDF

I would like your verified suppliers matching service! If you require testing equipment to test products such as home appliances, electrical accessories like switches, sockets, connectors, etc. Add to Alert PDF. Shenzhen Julixing Instruments Co.

You may delete a document from your Alert Profile at any time. Waterproof Circular Connectors M20 CNLinko 2 3 4 5 7 9 12 pin circular power signal waterproof connector aviation plug and socket. This standard is also available to be included in Standards Subscriptions. Shenzhen Linko Electric Co.

This consolidated version of IEC is based on the third edition and its supplements AB ie, CDEIwcGHJKLMNPQRSTU and amendments 2021222324252627282930313233 and 34 We have no amendments or corrections for this standard.

Your Alert Profile lists the documents that will be monitored. When the cap on a finished lamp has been screwed into 60061-3 gauge as far as it will go, the plunger surface W shall be co-planer with or project beyond surface X but it shall not project beyond surface Y.

IEC Go No Go Gauge for G13 Lamp Caps

Lamp caps Part 2: This standard is not included in any packages. We would appreciate your comments on the layout design, presentation or other aspects of our website. Please reply me widthin 24 hours.

  ARCMAP CRASHES EXPORTING PDF

Send your message to this supplier. Enter your email please. For the best results, we recommend including the following details: Professional testing equipment supplier, your reliable partner. Please first log in with a verified email before subscribing to alerts.

To check the dimensions S1 minimum and S1 maximum of E14 caps on finished lamps. As the voice of the U.

Go gauge for dimension “S1” of E14 caps on finished lamps, G Go gauge for dimension “S1” of E14 caps on finished lamps, G-1 Purpose: Please enter 20 to characters to contact this supplier! Recommended Quality Verified Suppliers.

18/30379226 DC

Already Subscribed to this document. It bears the edition number 3. Guidelines and general information Each part is independent of the other, but a given part should always be studied in conjunction with the other parts. Your message has been sent to the following suppliers.